Steel Frame Fabrication

Hawkins Steel Ltd recently completed work on the fabrication and installation of an AHU support platform on the roof of the Gielgud Theatre in central London.

To provide a safe working area for the installation a bespoke safety solution was required and put in place to provide a safe working area for the installation including man anchor points and Haki tower

The existing complex roof layout meant new bespoke padstones had to be constructed in situ for the steelwork to be fixed to.

The steelwork was fabricated in house and preassembled before being delivered to site.

Installation required closing Wardorf Street and use of aSpierings SK599-AT5 Mobile Tower Crane to lift the steelwork in to place.

The steel installation was completed in one day.

Summary
Client: Theatre Company
Duration: 2 Weeks
Contract Value: £100,000
Location: Central London
Download PDF

Kindly go to the settings page and check the option "Place them manually"
Logo Image
Logo Image
Logo Image
Logo Image
Logo Image
{"slides_column":"4","slides_scroll":"1","dots":"true","arrows":"true","autoplay":"true","autoplay_interval":"2000","loop":"true","rtl":"false","speed":"1000","center_mode":"false"}